Thursday, May 15, 2025

Aft Cabin and Head Finishing Touches 2025

The aft cabin and head were nearly completed in previous years. A few additional trim pieces were added this season to finish it off. 

The aft cabin has a nice storage locker and the head of the berth. The door was finally finish and installed with hinges and a push button latch to complete that wall. The AC and DC outlets for charging devices are to the left of the door. 


The aft cabin cabinet door was completed with hinges and a latch. 

Aft cabin storage closet door

The door was added in the aft head also. This was also done with the cane insert to allow for ventilation. 

Aft head door

Aft head latch detail

The bin board was added to the aft berth. This is needed to keep the mattress and person sleeping there from rolling out under heavy seas. Push button latches were also fitted to all the cedar lined drawers.

Aft cabin drawers and bin board


Full view of aft cabin bin board

View of the completed aft head with Lavac toilet


The last few posts wrap up our progress on the boat in the 2024/25 season. I am back is South Dakota to enjoy the summer on the lake. I will be back down in October or November before the snow flies. If you have any questions, leave a comment. I enjoy talking boats and remodels. I am kinda weird that way. 

Sail On/)
Mark

No comments:

Post a Comment