The aft cabin and head were nearly completed in previous years. A few additional trim pieces were added this season to finish it off.
The aft cabin has a nice storage locker and the head of the berth. The door was finally finish and installed with hinges and a push button latch to complete that wall. The AC and DC outlets for charging devices are to the left of the door.
![]() |
The aft cabin cabinet door was completed with hinges and a latch. |
![]() |
Aft cabin storage closet door |
![]() |
Aft head door |
![]() |
Aft head latch detail |
![]() |
Aft cabin drawers and bin board |
![]() |
Full view of aft cabin bin board |
![]() |
View of the completed aft head with Lavac toilet |