Work continues on the aft cabin and pilot house. Tambour has been added to all the walls and the new flooring has been installed in the aft cabin. See all the pictures below.
|
Aft cabin berth hull treatment |
|
Aft cabin flooring |
|
Aft cabin steps |
Aft head holding tank
|
Aft cabin flooring, cut outs will have flush latches |
No comments:
Post a Comment